K

Audited Plants by Name

Plant Audits as Determined by the Plant Audit Committee

K

Company Plant Location MPa Start Date Expiry Date Certificate
Kiwi Concrete Limited Christchurch 50 01 May 2024 30 Apr 2025 Download PDF
Christchurch No. 2 50 01 May 2024 30 Apr 2025 Download PDF
Kaikoura 50 01 May 2024 30 Apr 2025 Download PDF
Oamaru 50 01 May 2024 30 Apr 2025 Download PDF
Twizel 50 01 May 2024 30 Apr 2025 Download PDF

Key/Notes

  1. (Satellite) Plant which operates intermittently, as a satellite of another plant. It uses the same materials, mix designs and personnel as the parent plant.
  2. * Interim audit certificate. Usually on 3 month period.
  3. MPa indicates highest mix strength recorded and accepted by the Audit.
  4. Mixes over 50MPa are subject to specific agreements with client and are designated Special Concrete as defined in NZS 3109/NZS 3104.