Audited Plants by Name
Plant Audits as Determined by the Plant Audit Committee
Company |
Plant Location |
MPa |
Start Date |
Expiry Date |
Certificate |
Waikato Ready Mixed Concrete Limited
|
Riverlea
|
50 |
01 Feb 2023 |
31 Jan 2024 |
Download PDF |
Westbay Concrete Limited
|
Te Puke
|
50 |
01 Feb 2023 |
31 Jan 2024 |
Download PDF |
Wrey's Bush Concrete Products Limited
|
Otautau
|
50 |
01 May 2023 |
30 Apr 2024 |
Download PDF |
Key/Notes
- (Satellite) Plant which operates intermittently, as a satellite of another plant. It uses the same materials, mix designs and personnel as the parent plant.
- * Interim audit certificate. Usually on 3 month period.
- MPa indicates highest mix strength recorded and accepted by the Audit.
- Mixes over 50MPa are subject to specific agreements with client and are designated Special Concrete as defined in NZS 3109/NZS 3104.