Company Plant Location MPa Start Date Expiry Date Certificate
East Coast Concrete Limited Gisborne 50 25 Oct 2024 31 Jul 2025 Download PDF
Eastern Bay Concrete (2014) Limited Opotiki No. 2 50 01 Feb 2024 31 Jan 2025 Download PDF
Eastern Concrete Limited Gore 40 01 May 2024 30 Apr 2025 Download PDF
Ecomax RMC Limited Hamilton 50 01 Jul 2024 31 Jan 2025 Download PDF

Key/Notes

  1. (Satellite) Plant which operates intermittently, as a satellite of another plant. It uses the same materials, mix designs and personnel as the parent plant.
  2. * Interim audit certificate. Usually on 3 month period.
  3. MPa indicates highest mix strength recorded and accepted by the Audit.
  4. Mixes over 50MPa are subject to specific agreements with client and are designated Special Concrete as defined in NZS 3109/NZS 3104.